SECTOR: Corporate
EVENT: Student May Ball
VENUE: Cambridge
THE BRIEF: Provide a Stage Cover for a student ball inside one of Cambridge’s universities with short build and dismantle schedule. Situation was complicated with requirement to work alongside other contractors in relatively small site.
THE SOLUTION: After two site visits, it was decided to use an S5000 SaddleSpan Concert to allow a stage big enough for the acts booked. Due to the small site, extra care and calculations were needed to be made to make sure the frame could be winched up. To see an S5000 SaddleSpan being installed visit http://www.youtube.com/watch?